I’m always a bit puzzled by the amount of money going into data centres. Can anyone explain in simple terms why they cost so much?
AI companies are borrowing heavily too, so they can pay for new data centers. And that borrowing is growing fast. Dalio said big AI companies sold about $220 billion of bonds in the first half of 2026. That’s more than double the $108 billion they sold in all of 2025.
You need a lot of power to both run the equipment and to remove the waste heat from running the equipment. You need a lot of control systems to make sure that power is distributed smoothly , as spikes can damage both the computer equipment and the infrastructure that delivers it. You need at least some level of power backup system large enough to cover your complete demand for long enough to assure smooth shutdowns in the event of a loss of grid power (blackout). Otherwise, a blackout can destroy the data you’ve been working on.
You need the cooling equipment to exhaust the waste heat, and that often involves water. In addition to the equipment to move the water around, you need to make sure that water system is monitored to prevent and catch leaks, which can damage the electronics.
And when it comes to power and water supplies, the demands of the building itself are high enough that it often involves building up the infrastructure needed to deliver those ongoing consumables to the data center. Those costs are a key factor in the claims that data centers are behind why electric rates are going up.
And speaking of the electronics, AI data center computers are essentially giant boxes filled with high-end GPUs. In part because of the demand from the AI data centers themselves, those things are crazy expensive… Add things like communication infrastructure so the different boxes can talk to each other, redundancy so the loss of any one component doesn’t mean the loss of the system as a whole, and offsite backups (and the network capability and facilities to support them), and the complexity just increases.
Data center construction can take months, if not years, to get up and running. And because they don’t start generating revenue until they begin processing AI tokens, the longer a data center takes to come online, the more expenses pile up…
According to Nvidia, the Vera Rubin-powered DSX PODs will arrive on site, ready to be plugged into the power, cooling, and networking infrastructure, reducing deployment time from six months to 14 days. The company says DSX PODs won’t replace traditional data centers, but will serve as a means to start running AI applications before brick-and-mortar facilities are ready…
According to the company, the DSX POD supports liquid cooling, but because it uses dry-cooler designs, it can save up to 54 million liters of water per day versus a standard data center. Standing up data centers more quickly doesn’t just help Nvidia’s customers, though. Faster data center deployment should ease at least one of the chokepoints in the AI build-out, which means faster chip sales for Nvidia.
"Power scarcity, land constraints, skilled labor shortages and long equipment lead times are reshaping where and how data centers get built. As grid-connected power becomes harder to secure, land values are diverging sharply between powered and non-powered sites, pushing developers into new markets and new strategies to keep pace with demand.
These pressures are driving up all-in development costs across the board, even as the fundamentals supporting long-term demand remain strong."