# Army to install micronuclear plants at US bases as backup power

**URL:** <https://discussion.fool.com/t/army-to-install-micronuclear-plants-at-us-bases-as-backup-power/126173>\
**Category:** Nuclear Power\
**Created:** [August 27, 2026, 8:05pm UTC](https://discussion.fool.com/t/army-to-install-micronuclear-plants-at-us-bases-as-backup-power/126173 "2026-08-27T20:05:14Z")\
**Posts on this page:** 3\
**Page:** 1

<div class="post-metadata">

**Author:** ![pauleckler](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/pauleckler/32/2906_2.png) [@pauleckler](https://discussion.fool.com/u/pauleckler)\
**Post date:** [August 27, 2026, 8:05pm UTC](https://discussion.fool.com/t/army-to-install-micronuclear-plants-at-us-bases-as-backup-power/126173/1 "2026-08-27T20:05:14Z")

</div>

[https://apnews.com/article/nuclear-trump-army-microreactors-janus-200edd5fb98b6fe04d029a3c1dba1a4a](https://apnews.com/article/nuclear-trump-army-microreactors-janus-200edd5fb98b6fe04d029a3c1dba1a4a)

What do we know about these plants? Are they SMR? Approved for commercial use.

Data centers need power. Most will come from fossil fuels–natural gas or diesel–producing carbon dioxide. If micronuclear plants can be approved they might be the ideal solution. Or are these five years away? Not fast enough for data centers now under consideration.

---

<div class="post-metadata">

**Author:** ![waterfell](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/waterfell/32/8050_2.png) [@waterfell](https://discussion.fool.com/u/waterfell)\
**Post date:** [August 28, 2026, 2:19am UTC](https://discussion.fool.com/t/army-to-install-micronuclear-plants-at-us-bases-as-backup-power/126173/2 "2026-08-28T02:19:14Z")

</div>

> [@pauleckler](#):
>
> What do we know about these plants?

> **[Army reaches agreement with private industry for nuclear micro-reactors](https://www.army.mil/article/294891/army_reaches_agreement_with_private_industry_for_nuclear_micro_reactors)**
>
> WASHINGTON — The Department of the Army is announcing today that the Janus Program has selected five nuclear energy vendors, and five initial locations.

**The five selected vendors and installations are as follows:**

- **Antares Nuclear, Inc. – Fort Bragg, North Carolina**
- **BWXT Advanced Technologies, LLC – Fort Campbell, Kentucky**
- **General Atomics Electromagnetic Systems – Fort Hood, Texas**
- **Radiant Industries, Inc. – Fort Benning, Georgia**
- **Westinghouse Government Services – Fort Drum, New York**

Below are the websites, with at least a little information about the designs.

Antares:

> **[Antares Nuclear: Factory-Produced Fission Microreactors for Strategic Energy](https://antaresindustries.com/)**
>
> Factory-produced, deployable fission microreactors to provide strategic energy for mission-critical systems across Earth, space, and underseas.

BWXT:

> **[BWXT Advanced Nuclear Reactor (BANR)](https://www.bwxt.com/sectors/nuclear-energy/smrs-microreactors/bwxt-advanced-nuclear-reactor-banr/)**
>
> BWXT Advanced Nuclear Reactor (BANR) Our BANR microreactor is being designed as a modular, factory-fabricated nuclear energy solution. This compact and transportable system is a 75 MW thermal high-temperature gas reactor (HTGR) designed for remote...

General Atomics:

> **[GA Tactical Energy System (GA-TES)](https://www.ga.com/fission-energy-systems/tactical-energy-system)**

Radiant Industries:

> **[Janus | Radiant](https://www.radiantnuclear.com/)**
>
> Radiant builds Kaleidos, a portable, factory-built nuclear microreactor that delivers a megawatt of clean power anywhere it is needed.

Westinghouse:

> **[eVinci™ Microreactor | Westinghouse Nuclear](https://westinghousenuclear.com/innovation/evinci-microreactor/)**
>
> Westinghouse is currently developing the eVinci™ Microreactor, a next-generation, very small modular reactor for decentralized remote applications

BTW, Westinghouse recently achieved criticality from its eVinci reactor. The Antares test reactor also achieved criticality earlier this summer. See earlier thread.

> **[Westinghouse eVinci Reaches Criticality Milestone at Nevada Test Site](https://www.powermag.com/westinghouse-evinci-reaches-criticality-milestone-at-nevada-test-site/)**
>
> Westinghouse's eVinci microreactor has completed zero-power criticality testing at the National Criticality Experiments Research Center (NCERC), a

\_ Pete

---

<div class="post-metadata">

**Author:** ![pauleckler](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/pauleckler/32/2906_2.png) [@pauleckler](https://discussion.fool.com/u/pauleckler)\
**Post date:** [August 28, 2026, 5:17pm UTC](https://discussion.fool.com/t/army-to-install-micronuclear-plants-at-us-bases-as-backup-power/126173/3 "2026-08-28T17:17:43Z")

</div>

These appear to be developmental. Westinghouse appears to be furtherest along w operating reactor targeted 2028. Does list data centers as possible customer. But focused on govt contracts, not commercial uses for now.

Great to hear these mini reactors are under development but probably years away from commercial applications.
