Total cost?
Count me in.
The fossil fuel blockade in the middle east has an estimated ongoing run rate of about $440 billion per year to the US people.
Just 6 months cost $221 billion:
At this cost, the US could build 4 high speed rails per year, 3 in the US and 1 as a gift to another country (UK first).
The US could provide the (annual) gift of high speed rail to the world instead of the gift of fossil fuel blockade.