HS2: High Speed Rail in the UK

Total cost?

Count me in.

The fossil fuel blockade in the middle east has an estimated ongoing run rate of about $440 billion per year to the US people.

Just 6 months cost $221 billion:

At this cost, the US could build 4 high speed rails per year, 3 in the US and 1 as a gift to another country (UK first).

The US could provide the (annual) gift of high speed rail to the world instead of the gift of fossil fuel blockade.

6 Likes