# Phantom Data Centers

**URL:** <https://discussion.fool.com/t/phantom-data-centers/126804>\
**Category:** Macro Economic Trends and Risks\
**Created:** [October 13, 2026, 11:31am UTC](https://discussion.fool.com/t/phantom-data-centers/126804 "2026-10-13T11:31:03Z")\
**Posts on this page:** 11\
**Page:** 1

<div class="post-metadata">

**Author:** ![Goofyhoofy](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/goofyhoofy/32/4721_2.png) [@Goofyhoofy](https://discussion.fool.com/u/Goofyhoofy)\
**Post date:** [October 13, 2026, 11:31am UTC](https://discussion.fool.com/t/phantom-data-centers/126804/1 "2026-10-13T11:31:03Z")

</div>

Here’s an issue I had not heard about before: Phantom data centers.

In short, when a data center is planned, they look for power. A because different providers have different timelines and capabilities, the prospective owners may solicit from multiple power companies, as many as 3 or 4.

So those power companies have to factor into their building that power request, except oops, it may not materialize at all - for any of them as some data centers choose to build their own power stations.

Meanwhile the utilities have put inflated and possibly bogus capital requests on their books, taken it to regulators, and solicited capital in the bond markets.

More detail, likely better too, in today’s WSJ article:

**Phantom’ Data Centers Are Demanding More From the Power Grid Than They Need**

 
## **Utilities are imposing higher electricity rates and collateral requirements to identify legitimate data-center projects**

> Data-center developers are turning to utilities and grid operators for unprecedented [amounts of electricity].
> 
> The power industry is countering with a perhaps surprising question of its own: Are you for real?
> 
> The [artificial-intelligence boom] is driving a once-in-a-generation surge in electricity demand that should translate to a heyday for utilities. Yet the race has accelerated so quickly that it has become challenging to distinguish projects that are ready to build from those that might never materialize.
> 
> To plan their own investments and shield other customers, utilities are trying to filter out legitimate projects from wannabes by imposing higher electricity rates, longer-term contracts, collateral requirements and steep fees for engineering studies.
> 
> Utilities face a predicament: Underbuilding grid infrastructure risks missing a huge opportunity, but overbuilding could also be problematic. Because grid costs are shared, other electricity customers would be left to pick up the tab—and help a utility recoup its investment—if a data-center project falls through.

[https://www.wsj.com/business/energy-oil/phantom-data-centers-are-demanding-more-from-the-power-grid-than-they-need-77e322bb](https://www.wsj.com/business/energy-oil/phantom-data-centers-are-demanding-more-from-the-power-grid-than-they-need-77e322bb)

Under normal circumstances this might be a slight economic “oops”, but with the scale of these things driving the entire economy it could be a massive imbalance of capital allocation, industry costs, and ultimately consumer power bills. One source in the article notes that just 23% of such requests are considered “high confidence”, but they must plan for all of them anyway.

---

<div class="post-metadata">

**Author:** ![pauleckler](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/pauleckler/32/2906_2.png) [@pauleckler](https://discussion.fool.com/u/pauleckler)\
**Post date:** [October 13, 2026, 1:37pm UTC](https://discussion.fool.com/t/phantom-data-centers/126804/2 "2026-10-13T13:37:15Z")

</div>

And even when they build their own power plants they must face 2 or 3 year back logs for the obvious equipment like natural gas fired turbines. And pipelines must be constructed to supply the gas. NG does seem easier than finding grid connections. High tension lines need additional capacity and utility needs either idle capacity or generator construction.

Saying data centers planned will be on line in 2028 may be optimistic. And given increasing opposition and financial worries you wonder how many will ultimately get built. Many will delay waiting for good numbers. More will get completed if profit outlook is promising. Earning reports do matter as investors make their choices.

---

<div class="post-metadata">

**Author:** ![Leap1](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/leap1/32/72176_2.png) [@Leap1](https://discussion.fool.com/u/Leap1)\
**Post date:** [October 14, 2026, 2:35am UTC](https://discussion.fool.com/t/phantom-data-centers/126804/3 "2026-10-14T02:35:58Z")

</div>

A Chinese semi company is breaking fully into the AI memory chip production for December this year.

Chips gave up ground today. This is just the beginning of the fall.

If US manufacturing was dominant this would be a minor issue.

---

<div class="post-metadata">

**Author:** ![MarkR](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/markr/32/2011_2.png) [@MarkR](https://discussion.fool.com/u/MarkR)\
**Post date:** [October 14, 2026, 8:41am UTC](https://discussion.fool.com/t/phantom-data-centers/126804/4 "2026-10-14T08:41:23Z")

</div>

> [@Goofyhoofy](#):
>
> One source in the article notes that just 23% of such requests are considered “high confidence”, but they must plan for all of them anyway.

There’s an easy solution to this problem, that of identifying which are “real” (high confidence) and which are fake. Simply require a hefty deposit of cold hard cash up front before infrastructure work begins for a particular data center. Of course, because it’s so simple, it isn’t likely to happen. Mainly because politics always gets in the way of simple solutions.

I doubt they will really “plan for all of them” because the capital to do that isn’t there. But the question is will they plan properly for 20% of it or 50% of it or whatever percent of it, or will they end up with extreme overcapacity like the fiber revolution ~25 years did? Luckily, in the end, almost all the excess fiber eventually became useful and was used. Perhaps this time too, the excess power infrastructure, if it happens, will end up being used.

---

<div class="post-metadata">

**Author:** ![intercst](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/intercst/32/1543_2.png) [@intercst](https://discussion.fool.com/u/intercst)\
**Post date:** [October 14, 2026, 10:59am UTC](https://discussion.fool.com/t/phantom-data-centers/126804/5 "2026-10-14T10:59:52Z")

</div>

> [@MarkR](#):
>
> Perhaps this time too, the excess power infrastructure, if it happens, will end up being used.

Excess data center capacity can be repurposed for mass surveillance of the large, restive unemployed population.

China is already giving its citizens “social credit” scores for compliance with laws and regulations. Though AI tells me the focus is more on business rather than individual citizens.

[https://www.congress.gov/crs\_external\_products/IF/HTML/IF11342.html](https://www.congress.gov/crs_external_products/IF/HTML/IF11342.html)

intercst

---

<div class="post-metadata">

**Author:** ![pauleckler](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/pauleckler/32/2906_2.png) [@pauleckler](https://discussion.fool.com/u/pauleckler)\
**Post date:** [October 14, 2026, 5:12pm UTC](https://discussion.fool.com/t/phantom-data-centers/126804/6 "2026-10-14T17:12:27Z")

</div>

Re: mass serveilace

Implies govt will buy out failing data centers. Yes. This will be an excellent solution to the problem. Or maybe they can be used for military planning and design.

---

<div class="post-metadata">

**Author:** ![Leap1](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/leap1/32/72176_2.png) [@Leap1](https://discussion.fool.com/u/Leap1)\
**Post date:** [October 14, 2026, 7:16pm UTC](https://discussion.fool.com/t/phantom-data-centers/126804/7 "2026-10-14T19:16:31Z")

</div>

Our western society is recognizing abruptness in relationships.

Fearful people look to AI for smooth relationships.

The realists are rejecting that.

Surveillance won’t get a result here. Just parking tickets.

---

<div class="post-metadata">

**Author:** ![MarkR](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/markr/32/2011_2.png) [@MarkR](https://discussion.fool.com/u/MarkR)\
**Post date:** [October 15, 2026, 7:38pm UTC](https://discussion.fool.com/t/phantom-data-centers/126804/8 "2026-10-15T19:38:53Z")

</div>

> [@intercst](#):
>
> Excess data center capacity can be repurposed for mass surveillance of the large, restive unemployed population.

This post isn’t about excess data center capacity, it’s about excess electric capacity to a location where a data center is planned but is never built. For example, a company announces a large data center at some location that will require 250 MW of power, so the local power company gears up to bring additional capacity to that area over the next few years. But then suddenly a few years later, that data canter project is cancelled (due to bad planning, due to not getting funding, etc) but the infrastructure to bring the power there has already been built, or at least partially built.

---

<div class="post-metadata">

**Author:** ![DrBob2](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/drbob2/32/3456_2.png) [@DrBob2](https://discussion.fool.com/u/DrBob2)\
**Post date:** [October 15, 2026, 10:05pm UTC](https://discussion.fool.com/t/phantom-data-centers/126804/9 "2026-10-15T22:05:34Z")

</div>

> [@MarkR](#):
>
> This post isn’t about excess data center capacity, it’s about excess electric capacity to a location where a data center is planned but is never built.

Electricity is certainly fungible, so the above would only be a problem if most of the US has more power than it needs. Do you thing this is more than a local problem?

DB2

---

<div class="post-metadata">

**Author:** ![MarkR](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/markr/32/2011_2.png) [@MarkR](https://discussion.fool.com/u/MarkR)\
**Post date:** [October 16, 2026, 2:04pm UTC](https://discussion.fool.com/t/phantom-data-centers/126804/10 "2026-10-16T14:04:28Z")

</div>

> [@DrBob2](#):
>
> Electricity is certainly fungible

It’s mostly fungible, but only to the extent that the grid can “transport” it from one place to another. And that is often a problem. If it were truly fungible in an unlimited manner, we would be having this conversation in the first place because then data centers wouldn’t have to worry about _local_ availability of electricity, they would simply move it from someone who wants to sell it to wherever they need it.

---

<div class="post-metadata">

**Author:** ![pauleckler](https://sea2.discourse-cdn.com/motleyfoolfree/user_avatar/discussion.fool.com/pauleckler/32/2906_2.png) [@pauleckler](https://discussion.fool.com/u/pauleckler)\
**Post date:** [October 25, 2026, 4:27pm UTC](https://discussion.fool.com/t/phantom-data-centers/126804/11 "2026-10-25T16:27:42Z")

</div>

Re: data center cancellation and power demand

Much is changing and power companies and the grid need investment and time to adapt.

We are moving toward electric vehicles. Shifting power from fossil fuels to electricity. We are trying to phase out fossil fuels in power generation. Natural gas is temporary. Green energy wind, solar, geothermal, wave tech are the future. The grid needs to be updated and more capacity is implied (just to replace oil w kilowatts).

Utilities traditionally plan for future demand well ahead. Make investment and depreciate them over years making the investment relatively painless for users. The speed of data center demand growth makes that difficult. Everyone needs to adapt to the new situation.