Bearings and blades wearing out sooner than expected. Could be design issue.
1 Like
“Analysts at Jefferies expect costs of 2 billion euros in their calculation, 1.75 billion for onshore and 250 million for offshore.”
Does this include the half-billion disclosed earlier this year?
DB2
1 Like
Customers disagree with Siemens. Operations as expected.
Since this topic recently came up, I thought this was interesting
A small wind farm in Canada on Prince Edward Island (PEI) has a 60% failure rate. In the article, the turbine bearings are blamed, but that isn’t confirmed. The turbine manufacturer is Acciona, which I believe is a Spanish company.
- Pete
2 Likes