Apparently this was to be for Intel the kind of breakthrough/foundational core design that Zen became for AMD… and they can’t afford to go through with it? or they can’t wait that long? or… I dunno
2 Likes
Or perhaps in the end it did not pan out to be as good as originally advertised. One thing going on at Intel right now appears to be a reduction in project complexity in order to get them back on track. This may have killed that project.
This was supposedly a product called “beast lake”, which has never appeared on any roadmaps, so it may have been a figment all along.
We do know the 2025 product is Panther Lake, and the 2026 product is Nova Lake. The earliest we would have seen Beast lake is 2027.
1 Like